Badgery’s Creek Airport

Working on Western Sydney Airport's electrical infrastructure meant navigating strict aviation safety parameters, international standards, and a high-security environment. Our Level 2 electricians were tasked with installing ventilation systems for noise attenuation as part of this $280 million project. We developed specific safety protocols tailored to the aviation context and implemented redundant electrical systems utilising high-durability components designed for decades of reliable performance. What sets Beaches Electric apart is our comprehensive approach—from hazard reduction work before installation to thorough compliance documentation that meets international aviation standards. The result was zero safety incidents throughout the 6-month project and electrical systems that will serve this critical infrastructure for generations.

Client: Austream Builders for RCA Australia

Location: Western Sydney, NSW

Industry: Aviation Infrastructure

Project Value: Part of $280 Million project

Challenge

This significant infrastructure project required electrical systems for ventilation as part of noise attenuation works. The project presented unique challenges: 

  • Working within strict aviation safety parameters 
  • Meeting international standards for airport infrastructure 
  • Coordinating with numerous contractors in a high-security environment 
  • Completing essential hazard reduction works in a sensitive location 
  • Ensuring all electrical systems would function reliably for decades

Our Solution

Beaches Electric delivered a comprehensive approach:

Compliance and Documentation:

Compliance and Documentation:

  • Assumed full responsibility for all electrical compliance documentation 
  • Conducted comprehensive testing to international aviation standards 
  • Provided detailed handover documentation and training
Safety-First Implementation:

Safety-First Implementation:

  • Developed specific safety protocols for the aviation environment 
  • Conducted thorough hazard reduction works before installation commenced 
  • Maintained continuous safety monitoring throughout the project
Technical Excellence:

Technical Excellence:

  • Supplied, wired and installed complete ventilation systems 
  • Implemented redundancy in critical electrical systems 
  • Utilised high-durability components designed for minimal maintenance 
  • Applied our Level 2 electrical expertise to manage complex power requirements

Results

  • Achieved zero safety and compliance issues throughout the 6-month project
  • Completed all electrical work on schedule, supporting the broader project timeline
  • Delivered systems that met stringent international aviation standards
  • Established Beaches Electric as a capable contractor for aviation infrastructure
  • Created electrical systems designed for decades of reliable performance

Team Expertise Applied

This project demonstrated our capabilities in: 

  • Aviation infrastructure electrical requirements 
  • Level 2 electrical work for critical infrastructure 
  • International compliance standards 
  • Complex ventilation system integration 
  • High-security project protocols